Portfolio Categories Design

22 January 2015

EDPR obtains 20-year PPAs in Brazil

EDPR secured a 20-year contract in December for two projects totaling 219 MW. Renewable energy will be generated at two wind farms, which will be implemented in the Brazilian state of Río Grande del Norte: Santa Rosa and Mondo Novo, with a registered capacity of 121.8MW; and Aventura, with 9.71MW. With this new agreement, EDPR […]

25 March 2018

EDPR SIGNS AGREEMENT TO RECYCLE WIND TURBINE BLADES

http://google.es

25 March 2018

FIRE PREVENTION AND FIREFIGHTING

At EDPR, we see forest fire prevention as an essential part of our future. With a business model that relies on reducing the effects of climate change through clean energy, we aim to always stay active in the fight against the risks posed by forest fires.  Due to this, over the past year, EDPR has […]

25 March 2018

REDUCTION OF ACCIDENTS BY 40%

At EDPR, is top priority to guaranty the health, safety and well-being of its employees and contractors. A commitment that is supported by the Health and Safety policy. As an integral part of the H&S strategy, employees actively engage in both behavior-based safety and risk assessment activities based on the potential risks associated with their […]